Friday, August 18, 2017

Major Construction Completed

Work Performed, August 14th to August 18th
Roadway Improvements, paving new asphalt surface:
·         Oxford Lane
·         Somerset Drive
·         Brook Lane
·         Beech Drive
·         Ferndale Road
·         Kittyhawk Lane
·         Pinehurst Drive
·         The Glen Metra Parking Lot, surface patches only
·         Kendale Drive, patching only
·         Bonnie Glen, patching only

Miscellaneous other tasks including:
·         Asphalt driveway restorations
·         Repaired previously damaged curb
·         General site clean-up

Work Anticipated to be Performed to Complete project
·         Landscape restorations
o   Areas with storm sewer improvements, topsoil and sod
o   Areas with curb and sidewalk repairs, topsoil and seed
·         Pavement markings
·         Pick-up barricades around jobsites
·         General site clean-up

The major construction operations of the project are now completed. All roadways are paved with limited work remaining to be completed.

Landscape restorations will be completed in the coming weeks.  In areas where concrete curb & gutter or sidewalk was replaced, the landscape will be restored with topsoil and seed. In areas of underground utility improvements (primarily storm sewer), the landscape will be restored with topsoil and sod. These areas will have topsoil installed and graded; however, sod will not be installed until mid-September when growing conditions are typically more favorable.

Due to limited work remaining, this will be the final blog post for the project. We hope you found the information provided helpful. If you have any questions or concerns, please contact the Village Project Manager, Adriana Webb, at 847-904-4414.

Thanks again for all your patience and hopefully you are satisfied with the work that was performed and are enjoying the new streets.