Friday, June 23, 2017

Concrete Replacements On-Going

Work Performed, June 19th to June 23rd  
Storm sewer and underground utility improvements along:
·         Rugen Road
·         Bette Lane
·         Springdale Avenue 

Concrete Curb & Gutter and Sidewalk Replacements along:
·         Keenan Drive, south side of the street only
·         Halina Drive
·         Concord Lane, portions of the south side of the street only.
·         Cambria Court
·         Astor Court
·         Myrtle Parkway
·         Pfingsten Road
·         Rolling Pass
·         Somerset Drive
·         Oxford Lane
·         Sheryl Lane

Work Anticipated to be Performed, June 26th to June 30th  
Storm sewer and underground utility improvements:
·         Structure adjustments along entire project

Concrete curb & gutter and sidewalk replacements along:
·         Keenan Drive, north side of the street
·         Concord Lane, selected areas within neighborhood
·         Rolling Pass, west side of the street
·         Rugen Road, east side of the street
·         Springdale Avenue
·         Bette Lane 

The Village will provide all notices regarding driveway restrictions during concrete curb & gutter and sidewalk replacements. Please be on the look-out for these notices.

It is anticipated all concrete curb & gutter and sidewalk that has been or will be removed will be poured by the end of the week and prior to the July 4th weekend.  Also, all residents will have access to their driveway no later than Saturday, July 1st for the holiday weekend.

Following the July 4th weekend, the remaining concrete work will be completed and roadway resurfacing will begin.

Thanks again for all your patience and understanding during the construction process.

Monday, June 19, 2017

Storm Sewer Work Continues. Concrete Curb and Gutter Replacement Starting

Work Performed, June 12th to June 16th
Storm sewer and underground utility improvements along:
·         Somerset Drive
·         Oxford Lane
·         Pfingsten Road, south of East Lake Avenue

Work Anticipated to be Performed, June 19th to June 23rd
Storm sewer and underground utility improvements along:
·         Rugen Road
·         Bette Lane
·         Springdale Avenue 

Concrete Curb & Gutter and Sidewalk Replacements along:
·         Keenan Drive, south side of the street only
·         Halina Drive
·         Concord Lane, portions of the south side of the street only.
·         Cambria Court
·         Astor Court
·         Myrtle Parkway

The Village will provide all notices regarding driveway restrictions during concrete curb & gutter and sidewalk replacements. There has been significant confusion due to the contractor providing a separate notice. We apologize for this confusion and are working with the contractor to ensure it does not happen in the future.

Thanks again for all your patience and understanding during the construction process.

Tuesday, June 13, 2017

Underground Storm Improvements On-Going. Concrete Curb and Gutter Replacement Started

Work Completed, June 5th to June 9th  
Underground storm sewer repair work and drainage structure replacement along:
·         Keenan Lane
·         Halina Drive
·         Rolling Pass
·         Pfingsten Road
·         Somerset Drive
·         Oxford Lane

Preparation for concrete curb & gutter replacement along:
·         Keenan Lane (north side)
·         Halina Drive
·         Rolling Pass
·         Pfingsten Road

Work Anticipated to be performed, June 19th to June 23rd  
Concrete curb & gutter replacement along the following streets:
·         Keenan Lane (South Side)
·         Halina Drive
·         Pfingsten Road

Some work will be performed in front of driveways. If work is scheduled to be performed in front of your driveway, access will be restricted for approximately 5 days. The Village of Glenview will hand-deliver a letter to your door prior to removing the curb & gutter and/or sidewalk in front of your driveway stating the day and time in which the vehicles should be removed and parking instructions. Please be on the look-out for these letters. Everything will be done to minimize the amount of time access is restricted.

Thank you again for all your patience during construction.